害羞草研究所

Skip to content

Sicamous Channel closures postponed until September

BC Hydro work relocating lines for Bruhn Bridge won害羞草研究所檛 interrupt channel traffic this month
33348813_web1_20200424-SAA-Bruhn-Bridge-JE-027
Sicamous Channel traffic won害羞草研究所檛 be interrupted for BC Hydro relocation work on the Bruhn Bridge replacement project until September. (File photo)

Boat traffic on the Sicamous Channel will flow uninterrupted by BC Hydro work for the summer.

BC Hydro had originally scheduled intermittent channel closures to facilitate line relocation, allowing the Ministry of Transportation and Infrastructure access to the R.W. Bruhn Bridge for the bridge replacement project.

Original closures were scheduled for July 19, with 10-15 minute delays expected.

However, BC Hydro has now postponed the work and resulting channel closures to September.

More information about exact dates and times of channel closures will be communicated as they are decided.

Keep track of the Bruhn Bridge project at the ministry害羞草研究所檚 website.

READ MORE:



rebecca.willson@saobserver.net

Like us on and follow us on and subscribe to our daily .



Rebecca Willson

About the Author: Rebecca Willson

I took my first step into the journalism industry in November 2022 when I moved to Salmon Arm to work for the Observer and Eagle Valley News. I graduated with a journalism degree in December 2021 from MacEwan University in Edmonton.
Read more



(or

害羞草研究所

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }