害羞草研究所

Skip to content

Teachers worried after 12 gas leaks in 3 months at B.C. elementary school

School district insists students and staff not at risk, despite a dozen incidents in three months
16839312_web1_190418-CAN-gas-leak2
Castlegar fire chief Sam Lattanzio was called to a suspected gas leak at Castlegar Primary School April 15. Photo: John Boivin

A series of gas leaks at Castlegar Primary School over a number of months has turned into a saga that has kept School District 20 maintenance workers busy and left the local teachers害羞草研究所 union frustrated.

FortisBC says it has been called to the school 12 times in the last three months, but problems with reoccurring gas smells and gas equipment go farther back than that. School district reports indicate a string of incidents dating back at least a year.

Persistent problems

It started in spring 2018 when a teacher was worried that kids could climb on an outdoor gas meter at the school.

In December of that same year, the first smell of gas was reported.

Emergency services were called, the school was evacuated and a gas bleed valve was determined to be the cause of the smell.

In January 2019, there were three reports of natural gas smells.

In the three months that followed, another incident was reported each month.

Some incidents had a cause 害羞草研究所 a regulator, a leaky main valve and HVAC units 害羞草研究所 but others didn害羞草研究所檛 seem to.

A report states that as the investigation progressed and formal witness statements were gathered, more occurrences were identified and there had been reports over many years of concerns about gas smells.

害羞草研究所淎s we began to investigate, it was reported that: 害羞草研究所業t has always been like this. We have always smelled natural gas off and on for over 10 years,害羞草研究所櫤π卟菅芯克鶟 school district manager of safety and wellness Julie Cole said.

Cole has only been on the job for about two years, and the position is new, so she says she doesn害羞草研究所檛 know why those earlier incidents weren害羞草研究所檛 reported and recorded.

Cole says the fact the building is over 50 years old and also has aging equipment is a major part of the problem.

The lack of consistent reporting and inspections are also cited in the report as contributing causes. Communication issues and lack of training were cited as 害羞草研究所渟ubstandard conditions.害羞草研究所

SD20 says it is not sure how many times gas leaks have been detected because consistent records were not kept.

Regardless, the situation is now so uncertain the vice-principal has been wearing a gas monitor for the last three to four months.

Cole says since the supervisor is in and out of the building all day and in all areas of the building, the district thought it was a good way to detect any leaks that may have been missed.

Because the leaks have been so intermittent, the district plans to continue using the monitor until the end of the school year.

害羞草研究所淚f there is any indication the building is not safe, we want to address it,害羞草研究所 said Cole.

Union concerns

The Kootenay Columbia Teachers害羞草研究所 Union became concerned enough about the situation that they asked regulating authorities to look at the problem.

害羞草研究所淲e are very concerned about the numerous gas leaks,害羞草研究所 said union president Andy Davidoff. 害羞草研究所淭he orders from WorkSafe and Technical Safety BC point to equipment that isn害羞草研究所檛 up to code, and processes with respect to reporting that are not being followed in accordance with WorkSafe regulations and that is very concerning for us.

In March, the school failed an inspection from Technical Safety BC, the group in charge of overseeing the safe installation and operation of technical systems and equipment

Modulating gas valves had been added to the HVAC units at the school and the district was ordered to remove them from any building where 害羞草研究所渕odulating valves may have been added to any appliance that is not certified to operate with these valves.害羞草研究所

Problems with the school害羞草研究所檚 boiler were also cited as well as issues with rough piping. The district was ordered to inspect all gas piping and appliances at the school and to repair as needed. They were also ordered to paint all of the black iron gas pipe on the exterior of the building.

The order stated that all appliances should be serviced yearly at the minimum and repaired immediately should any issues be found.

But FortisBC and the school district assert the building is safe. But Davidoff says with the number of leaks and FortisBC visits to the site, doubts about safety have crept in.

害羞草研究所淚t is stressful for everyone at Castlegar Primary,害羞草研究所 he said. 害羞草研究所淲e do not want to be alarmist 害羞草研究所 but there is obviously something wrong when you have this number of gas leaks 害羞草研究所 It is the uncertainty that is very concerning.害羞草研究所

With so many incidents, union wonders why it took their complaints to bring in outside help.

The findings of WorkSafeBC cited 害羞草研究所渋ncidents with high potential for serious injury,害羞草研究所 reporting and record keeping.

Modifications for the district害羞草研究所檚 inspection report forms were ordered, and Cole says they will roll out a new safety software system by the start of the new school year. There will be a switch from a paper-based system to a digital system with all records, investigation reports and related documents in one spot.

The union also wants to ensure that anyone can report a gas leak. Currently, a teacher must tell a supervisor who will then call 911 and FortisBC.

Davidoff worries that now, if a supervisor isn害羞草研究所檛 on site then there害羞草研究所檚 nothing a teacher can do.

害羞草研究所淚t害羞草研究所檚 inappropriate,害羞草研究所 said Davidoff.

Parent communication concerns

The teachers union is worried that parents didn害羞草研究所檛 hear about the gas leaks until one of the last incidents in April 害羞草研究所 and even then, Davidoff said it was only with the union害羞草研究所檚 insistence.

The letter references 害羞草研究所渘uisance害羞草研究所 smells and states the detection of the smell of natural gas at Castlegar Primary has been ongoing, with several such occurrences over the last number of weeks.

It lists the different inspections that have occurred at the site, but does not include detailed findings of those inspections or a list of repairs that have been made.

Davidoff remains concerned about the district害羞草研究所檚 response.

害羞草研究所淭his is no longer a safe school issue 害羞草研究所 it is about the absolute lack of process in terms of how reports are filed, the ongoing leaks, in terms of downplaying what a gas leak is 害羞草研究所 calling it a nuisance,害羞草研究所 he said.

害羞草研究所淚t is about not getting full disclosure to parents.害羞草研究所

Training and maintenance plans

Cole says the district is working on providing consistent health and safety training for all its employees and will roll out specific training modules in September. Training sessions will look at safety issues specific for each building, incident investigation procedures, hazard identifications, risk assessments and other related topics.

Cole says there has not been a formal schedule in place and maintenance was more on a basis of dealing with issues as they arose but that the district will set one up.

Davidoff hopes the saga with gas leaks at the school is over and his members can begin to feel safe in their work place again.

Ideally, the union would like to see the government tear the 52-year-old school down and build a new one, he says, but they realize that is probably many years in the future.



betsy.kline@castlegarnews.com

Like us on and follow us on



Betsy Kline

About the Author: Betsy Kline

After spending several years as a freelance writer for the Castlegar News, Betsy joined the editorial staff as a reporter in March of 2015. In 2020, she moved into the editor's position.
Read more



(or

害羞草研究所

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }