害羞草研究所

Skip to content

Construction on Buchanan Road in Peachland for June

The affected stretch is between Eyre Road and Tailyour Lane
web1_240606-wek-peachland-buchanan-rd-buchananrd_1
Bennett Contracting will be performing utility work along a stretch of Buchanan Road in Peachland through June. (Photo/District of Peachland)

Single-lane alternating traffic along Buchanan Road in Peachland is in place for the of June for utility work.

The affected stretch is between Eyre Road and Tailyour Lane.

Construction is allowed between 7 a.m. and 5 p.m. with delays expected to be no longer than 10 minutes.

Questions can be directed to the Bennett Contracting site supervisor at 250-718-3444.

READ MORE: Peachland property tax notices have been popped in the mail

READ MORE: 2nd Annual Open House and BBQ for Peachland residents



Gary Barnes

About the Author: Gary Barnes

Journalist and broadcaster for three decades.
Read more



(or

害羞草研究所

) document.head.appendChild(flippScript); window.flippxp = window.flippxp || {run: []}; window.flippxp.run.push(function() { window.flippxp.registerSlot("#flipp-ux-slot-ssdaw212", "Black Press Media Standard", 1281409, [312035]); }); }